- Reaction score
- 6,775
- Points
- 1,040
Probably not, or at least not in the right spots. The depots are doing a lot of ongoing work to clean out old stuff that isn't need (lot of spares from equipment that has been disposed of sitting around) which is probably the downside of previous stockpiling but not really tracking what it's spares for, and disposal project being done ad hoc so didn't clean out the inventory. There was a big effort to do that with the 280 disposal, and got rid of 100s of tonnes of redundant spares (some from old steamers), but still missed things. I'm sure it's the same on army and airforce side.On a basic level, is there even the physical infrastructure; warehousing and other more niche storage facilities, transport, etc.) to support whatever a proper spares/mobilization/stockpile setup would look like?
But there are a lot of areas of the country with huge amounts of space so not an impossible problem.