• Thanks for stopping by. Logging in to a registered account will remove all generic ads. Please reach out with any questions or concerns.

BC Hydro granted $171 million in no-bid Site C dam contracts as project troubles were kept secret from public

daftandbarmy

Army.ca Dinosaur
Reaction score
25,794
Points
1,160
Hmm, SNC Lavalin, where have we heard of that name before?
 
Having been involved deeply from the permitting side of this, it's a mammoth project, the Joint Review Panel documents alone were around 60,000 pages plus other studies. Nobody I worked with from the BCH side had worked on something this big before, mainly as no big project like this had been done in BC in a long time. (To be fair, no one on the government side had any experience either) As much as I despise SNC Lavalin, it's not surprising they brought them in as they do have real world experience on large hydroelectric projects.
 
Back
Top